VMKConstruction
(916) 502-2181vmkconstruction4u@gmail.com

Greater Sacramento & the SF Bay Area

Get a free consultation
Backyard cottages, garage conversions & JADUs

ADU Builder & Accessory Dwelling Unit Contractor in Sacramento, CA

VMK Construction is a licensed Sacramento general contractor that designs, permits, and builds code-compliant ADUs and JADUs end to end — turning unused backyard or garage space into rental income, family living space, and added home value. From the first feasibility visit to your certificate of occupancy, one accountable team handles everything.

ADU Construction by VMK Construction in Greater Sacramento

What Is an ADU?

An ADU, or Accessory Dwelling Unit, is a second, fully independent home on the same lot as a single-family house — a granny flat, in-law suite, casita, or backyard cottage with its own kitchen, bathroom, sleeping area, and separate entrance. In greater Sacramento, ADUs can be built brand-new and detached, attached to the main house, or converted from an existing garage; a smaller Junior ADU (JADU) is carved out of the existing home itself. California has aggressively legalized ADUs to ease the housing shortage, so most Sacramento-area lots can now add one ministerially, without discretionary public hearings.

ADU Construction detail — VMK Construction, Sacramento

ADU Types & Services We Build

Whatever fits your lot and your goals, we build it — and we confirm exactly what is allowed during the feasibility visit.

  • New detached ADU — ground-up backyard cottage, studio to 2-bedroom
  • Attached ADU — an addition connected to the main house
  • Garage conversion ADU — converting an existing attached or detached garage
  • Garage demolition and rebuild as an ADU
  • Junior ADU (JADU) — created inside the existing home, up to 500 sq ft
  • Multifamily / detached ADUs on duplex and apartment lots (SB 1211)
  • Pre-approved ADU plan builds — City and County of Sacramento permit-ready plans
  • Custom ADU design-build with architectural and engineering plans
  • Legalization of unpermitted / pre-2020 ADUs (AB 2533 path)
  • ADU permitting, plan-check management, and utility connections

Our ADU Process

Six clear stages from your first call to handing you the keys.

  1. 01

    Free consultation & feasibility

    we confirm zoning, setbacks, and utility access, then tell you what type and size your lot supports and what it will realistically cost and rent for.

  2. 02

    Design & engineering

    site plan, floor plan, elevations, and structural, electrical, and Title 24 plans, or a fast-track build using City/County pre-approved plans.

  3. 03

    Permitting & plan check

    we submit a complete application and manage plan check; state law requires a completeness determination within 15 days (SB 543) and most approvals within 60 days.

  4. 04

    Construction

    foundation, framing, MEP rough-ins, insulation, drywall, finishes, and utility hookups, with updates at every inspection milestone.

  5. 05

    Inspections & certificate of occupancy

    we schedule and pass all inspections; under AB 1308 final inspections happen within 10 business days of completion notice.

  6. 06

    Walkthrough & handoff

    a final walkthrough, your warranties and documentation, and an ADU ready to rent or move into.

Why Homeowners Choose VMK for Their ADU

ADUs live or die on the details — code knowledge, permitting, and honest pricing. This is where we earn the job.

  • Licensed Class B California general contractor you can verify on the CSLB website (CA Lic. #TBD)
  • True design-build: one accountable team from feasibility through certificate of occupancy
  • Deep knowledge of 2026 California ADU law and both City and unincorporated Sacramento County codes
  • Fixed, transparent pricing with no hidden change-order games
  • Fast-track builds using Sacramento City and County pre-approved plans
  • We manage the entire permit and plan-check process so you never sit in a planning office
  • Local crews who know Sacramento soils, climate, inspectors, and supply chains
  • Smart layouts and durable, tenant-ready finishes to maximize rental income
  • Licensed Class B general contractor (CSLB #1078912) — verify it on the CSLB website
  • Workmanship warranty standing behind the build after handoff

ADU Costs & Timelines in Sacramento (2026)

Real numbers, not vague ranges. New detached ADUs run roughly $250 to $400 per square foot — about $150,000 to $240,000 for a 600 sq ft unit — while garage conversions are often $80,000 to $150,000 because they reuse the existing foundation and walls. Sacramento generally runs 20 to 40 percent below Bay Area pricing. Plan on about 4 to 6 months of construction once permits are approved. Sacramento ADUs commonly rent for $1,000 to $2,800 a month, with many owners seeing 8 to 12 percent cash-on-cash returns and breaking even in roughly 6 to 8 years. Your exact number depends on size, finishes, site conditions, and utility runs — which is why we give a detailed fixed quote up front.

Service Area

We build ADUs across the City and County of Sacramento and the surrounding cities, each with its own ordinance layered over state law: Sacramento, Elk Grove, Roseville, Folsom, Citrus Heights, Rancho Cordova, Carmichael, West Sacramento, and Davis.

Common questions

ADUs questions, answered straight

How much does it cost to build an ADU in Sacramento in 2026?

Most new detached ADUs run roughly $250 to $400 per square foot, so a 600 sq ft unit typically lands around $150,000 to $240,000. Garage conversions are cheaper, often $80,000 to $150,000, because they reuse the existing foundation and walls. Sacramento generally runs 20 to 40 percent below Bay Area pricing. Your exact cost depends on size, finishes, site conditions, and utility runs, which is why we give a detailed fixed quote up front.

How long does an ADU take to build?

Plan on about 4 to 6 months of construction once permits are approved. A garage conversion can be roughly 3 to 5 months from permit to move-in, while a ground-up detached ADU is usually 6 to 12 months including design and permitting. Using Sacramento's pre-approved plans can clear plan check in days instead of weeks.

Do I need a permit, and how fast can I get one?

Yes, every ADU needs a building permit. The good news is approval is ministerial, meaning no public hearings. State law (SB 543) now requires Sacramento to deem your application complete within 15 days, and most jurisdictions must approve or deny within 60 days. Pre-approved plans move even faster. We handle the entire submittal and plan-check process for you.

How big of an ADU can I build on my Sacramento lot?

In the City of Sacramento, detached ADUs can reach 1,200 sq ft, attached ADUs are capped at 50 percent of the main house or set caps of 850 sq ft (one bedroom) to 1,000 sq ft (more bedrooms), and a JADU maxes out at 500 sq ft. There is no minimum lot size statewide, though setbacks and lot coverage still apply. We confirm exactly what fits during the feasibility visit.

What are the setback and height rules?

Detached ADUs require only a 4-foot side and rear setback, and you must keep at least 4 feet between structures. Height is typically 16 feet, rising to 18 feet near a major transit stop or over a garage, and up to 18 to 20 feet under the state-standards path to match the main home's roofline. These rules were loosened by recent state laws like AB 1332.

Can I rent out my ADU, and do I have to live on the property?

Yes, you can rent a standard ADU, and California has permanently removed owner-occupancy requirements for standard ADUs, so you can rent both the main house and the ADU. JADUs are the exception: as of 2026 (AB 1154) owner-occupancy applies to a JADU only when it shares a bathroom with the main house. Short-term rentals under 30 days are restricted under the state-standards path.

How much rent can a Sacramento ADU generate?

Sacramento ADUs commonly rent for about $1,000 to $1,800 for studios and one-bedrooms and $2,000 to $2,800 for two-bedrooms, with most landing in the $1,500 to $2,500 range. Many owners see 8 to 12 percent cash-on-cash returns and break even in roughly 6 to 8 years, while the rental income helps cover the construction loan.

Will an ADU raise my property taxes or home value?

An ADU is reassessed only on the new added value, not your whole property, so your existing base assessment stays put. On the upside, a well-built ADU can meaningfully boost resale value, with homes that include quality ADUs often selling for notably more in Northern California markets.

What is the difference between an ADU and a JADU?

An ADU is a fully independent home with its own full kitchen and bathroom and can be detached or up to 1,200 sq ft. A JADU is small, up to 500 sq ft, carved out of the existing house, needs only a kitchenette, and may share a bathroom with the main home. JADUs are cheaper but smaller and carry the shared-bathroom owner-occupancy rule.

I have an old unpermitted unit. Can you legalize it?

Often, yes. California's AB 2533 created a clear path to legalize ADUs and JADUs built before January 1, 2020, and local agencies cannot deny the permit solely because the unit was never authorized. They use a health-and-safety checklist instead. We assess the structure and guide you through bringing it into compliance.

Let's build it

Tell us what you have in mind.

We'll give you an honest assessment and a real number — type, timeline, and a fixed price. No pressure, no obligation.

Free consultation · response within 24 hours